Method and management system

How is the top event chosen in a bowtie?

The top event is the moment control over the hazard is lost — nobody has been hurt yet, but the event is now under way. A well chosen top event is a single sentence, observable and neutral: "liquid released from the tank". "Injury" is not a top event, it is a consequence; "valve failure" is not one either, it is a threat. The commonest mistake is placing it too late or too early: too late and there is no room left for preventive barriers, too early and the diagram fills with normal operating steps.

Definition

The knot of the bowtie is the top event: the moment control over the hazard is lost. Everything before it belongs to prevention, everything after it to mitigation. Its position therefore sets the geometry of the whole diagram.

Three tests

  • Observable — when it happens, somebody on site could notice it.
  • Neutral — it contains neither the cause nor the consequence.
  • A single sentence — two events joined by "and" are two separate bowties.

What is not a top event

Written asActually
A worker is injuredConsequence — belongs on the right
The valve failsThreat — belongs on the left
Maintenance is skippedEscalation factor — it weakens a barrier
Flammable liquid is storedThe hazard itself — the heading of the bowtie

Too late and too early

Set too late ("a fire started"), there are no preventive barriers left to draw and the diagram grows on one side only. Set too early ("the pump was started"), the left side fills with normal operating steps and the bowtie becomes a process flow drawing. The right place is between the two: no harm yet, but no normal operation either.

Not the same as the hazard

A hazard is inherent to the work and usually cannot be removed — pressure, height, energy, substance. The top event is the moment that hazard breaks loose. One hazard can have several top events, and each of them deserves its own bowtie.