Maintenance module

Maintenance: the second calendar next to statutory inspection

Statutory inspection is the calendar the law asks for, maintenance is the calendar the equipment asks for; once the two are mixed into one list, one of them always slips. This page describes the planned scope for the maintenance module.

This page is written for the technical teams that build the maintenance plan and the OHS specialists who run the inspection calendar.

What the scope covers

  • Planned maintenance calendarThe aim is to show planned maintenance work tied to the equipment record on a calendar.
  • Breakdown and response recordCollecting unplanned breakdowns and the response on the same equipment record is part of the planned scope.
  • Ownership of the work orderFollowing the owner, the state and the closure of a maintenance job is part of the design.
  • Kept apart from inspectionKeeping the maintenance record from blending into the statutory inspection record is observed by holding them apart in the design.
  • Equipment historyThe aim is to read the maintenance history of an item of equipment in a single list.

When does this module open

This page is updated once the module is queued; if you write which headings your maintenance plan needs, it is taken into account in the ordering.

Maintenance module

What sits in your maintenance plan

Send us what you expect from the scope; the module is announced from this page once it is queued.

Request a call