The prior notice threshold
| Threshold | Measure |
|---|---|
| Duration + headcount | Longer than 30 working days with more than 20 workers at the same time |
| Volume of work | More than 500 person-days |
The notice goes to the competent authority before work starts and is displayed on site. Türkiye's counterpart uses the same logic and the same numbers: the thresholds survived transposition.
Coordinator: structure, not size
The coordinator duty depends on the number of contractors, not workers. Where more than one contractor is present, coordinators are appointed for the preparation and construction stages — a single-contractor site does not trigger it.
What we could not measure
Annex III lists the content of the prior notice. In the published source that annex appears as an image, so it could not be read as text — which is why we do not list its content items here. Presenting an unmeasured item as measured is precisely what these pages do not do.
Transposition differences
The directive does not apply directly; each member state transposes it. Thresholds are usually preserved; the procedure and the authority change.