Sectors

How does the site plan duty differ from country to country?

We measured four regimes side by side. Türkiye and the EU share the same threshold (30 working days plus 20 workers, or 500 person-days) and both have a plan, a separate file and a coordinator. The UK uses the same threshold but appoints a principal designer and principal contractor instead of a coordinator, and the burden returns to the client if nobody is appointed. The US has no general plan, no prior notice and no coordinator; the duty comes from work-specific conditional plans. One of the few shared items is the high-risk work list.

Side by side

TürkiyeEuropean UnionUnited KingdomUnited States
General plan mandatoryYesYesYesNo
Notification threshold30 working days + 20 workers · or 500 person-days30 working days + 20 workers · or 500 person-days30 working days + 20 workers · or 500 person-daysNone
CoordinationHealth and safety coordinatorPreparation and construction coordinatorsPrincipal designer + principal contractorPrime contractor joint responsibility
Separate fileHealth and safety fileFileHealth and safety fileNone
High-risk work listAnnex 2 (11 items)Annex IISchedule 3 (same 10 items as Annex II)Work-specific conditional plans

Measured item counts

Items derived from the source texts: Türkiye 19 (14 unconditional), European Union 10 (6), United Kingdom 15 (6 binding, the rest guidance or conditional), United States 9 (3 unconditional, the rest conditional).

Two misleading similarities

First: identical thresholds do not mean identical procedure — who is notified and how it is displayed differ. Second: overlapping high-risk lists do not mean measures transfer; the evidence expected for the same work differs.

One Turkish addition

Türkiye's Annex 5 — façade scaffolds, temporary edge protection, mast climbing work platforms, safety nets — has no counterpart in the EU directive. For a cross-border contractor this is where the assumption "we comply with the EU, so we comply with Türkiye" breaks.

Manage this in Optifora

Optifora is not a single program but a compliance platform assembled from modules. The catalogue states which module is ready today and which is on the roadmap.

See what Optifora is